NOTE: Always test the product in a small, inconspicuous area before beginning a project. We recommend preparing a sample board prior to beginning a project to check color and technique. ShimmerStone should be mixed thoroughly before using.
To achieve a layered stone look, use the following 3-step application method. The base coat of ShimmerStone should be the deepest hue, and then one or more lighter hues are applied over the base coat.
STEP 1 Base Coat: With a stainless steel trowel apply a thin, uniform coat of ShimmerStone base color to entire surface using broad sweeping strokes and firm pressure. Allow product to completely dry, approximately 2 hours.
STEP 2 Texture Coat: Transfer some of the base color to a paint roller tray. Dampen the ShimmerStone Natural Sea Sponge Roller and squeeze out excess water. Work in sections. Using the roller, lightly load it with the base color and randomly roll product over the surface in all directions, covering approximately 75% of the section’s surface. While product is still wet, use the trowel to “knock-down” peaks, by gently pulling across the surface, holding the trowel at a very
low angle (25-30 degrees). The surface will now have some texture, consisting of raised and recessed areas. Allow product to completely dry, approximately 2 hours.
STEP 3 Skim Coat: Apply a skim coat of ShimmerStone in a different color or a lighter hue. The more contrast in color or hue, the more dramatic the effect. Work in sections. Load the trowel with product and using firm pressure, skim over
the texture coat, pulling the trowel tight and towards you in an arc, approximately 8” in length. “Feather out” the edge of the section by rolling the Natural Sea Sponge Roller, loaded with ShimmerStone, into the edge, so that no hard lines are
visible. This technique will help avoid lap marks, hard edges or build-up due to double application of product. Continue process until entire surface is coated. Around doorframes and in tight areas, use a small putty knife to pull and smooth out excess ShimmerStone. Allow product to completely dry, approximately 2 hours.